Earthing System for Solar PV Power Plant i. The photovoltaic modules, BOS and other components of power plant requires adequate earthing for protecting against any serious faults as guided by IEC 60364. ii. The earthing system shall be designed with consideration of the earth resistivity of the project area. The earth resistivity values shall be measured prior to designing the earthing system. Unless otherwise specified, earthing system shall be in accordance with IS: 3043 and IEEE 80, Indian Electricity Rules, Codes of practice and regulations existing in the location where the system is being installed. iii. The permissible system fault power level at 22kV also shall be kept in consideration while designing the earthing system. Each array structure of the PV Yard, LT power system, earthing grid for switchyard, all electrical equipment, control room, PCU, All junction boxes, ACDB & DCDB etc., shall be grounded properly as per IS 3043 - 1987. All metal casing/shielding of the plant shall be thoroughly grounded in

Earthing System for Solar PV Power Plant i. The photovoltaic modules, BOS and other components of power plant requires adequate earthing for protecting against any serious faults as guided by IEC 60364. ii. The earthing system shall be designed with consideration of the earth resistivity of the project area. The earth resistivity values shall be measured prior to designing the earthing system. Unless otherwise specified, earthing system shall be in accordance with IS: 3043 and IEEE 80, Indian Electricity Rules, Codes of practice and regulations existing in the location where the system is being installed. iii. The permissible system fault power level at 22kV also shall be kept in consideration while designing the earthing system. Each array structure of the PV Yard, LT power system, earthing grid for switchyard, all electrical equipment, control room, PCU, All junction boxes, ACDB & DCDB etc., shall be grounded properly as per IS 3043 - 1987. All metal casing/shielding of the plant shall be thoroughly grounded in

  • 2020-10-09T09:46:35

Have any question or need any business consultation?

Have any question or need any business consultation?

Contact Us
Chat with us